Lagatar24.com
Language : HINDI
  • Home
  • Jharkhand
  • Bihar
  • National & World
  • Business
  • Health & Lifestyle
  • Sports
  • Entertainment
  • Career
  • Tech – Gyan
  • Opinion
Sunday, 12 October, 2025
Lagatar24.com
  • Home
  • Jharkhand
  • Bihar
  • National & World
  • Business
  • Health & Lifestyle
  • Sports
  • Entertainment
  • Career
  • Tech – Gyan
  • Opinion
Lagatar24.com
No Result
View All Result
  • Home
  • Jharkhand
  • Bihar
  • National & World
  • Business
  • Health & Lifestyle
  • Sports
  • Entertainment
  • Career
  • Tech – Gyan
  • Opinion
Home Jharkhand

58-km stretch of Patratu-Jarangdih BG double train line project completes 

Passenger convenience to increase, trains to be operated on time

Lagatar News by Lagatar News
July 13, 2022
in Jharkhand
Share on FacebookShare on Twitter

MANOJ SINHA

 

Ramgarh, July 13: The 58-km stretch of the Patratu-Jarangdih BG double line project was finally completed on Tuesday.

In the final phase of the project, under the Jarangdih-Dania 29 km long double line project, the 5.5 km long Bokaro Thermal-Gomia railway section was inspected by the Commissioner of Railway Safety, Eastern Circle, Kolkata Sounmay Mitra.

During the inspection, Bokaro Thermal-Gomia Station North and South Line were inspected by a motor trolley. Meanwhile, the bridge-culvert, station building etc. were also closely reviewed.

This was followed by a speed trial at a speed of 110 kmph. After the success of the speed trial, the train operation got the green signal on the newly constructed double line with some instructions.

With the completion of the Patratu-Jarangdih double line, not only the passenger convenience will increase but trains will also be operated on time.

Since coal is sent to every part of the country from the railway siding of the Dhanbad division CIC section, the operation of goods trains will also be easy and the loaded goods will also be made available quickly as the goods trains will also reach their destination in less time.

ADRM Operation Ashish Kumar, Senior DOM Dhanbad Pankaj Kumar, Senior DSTE Gautam Gupta, Senior DEN Co-ordination Amit Kumar, Deputy CE Construction Kunal Kumar, Deputy CSTE Sumant Lal, IOW Anil Kumar Rajak, TI Vivek Kumar were present during the inspection.

 

Share76Tweet47
Previous Post

Singapore Open: Sindhu makes winning start, Mithun Manjunath knocks out Srikanth

Next Post

India surpass Pak in ODI rankings after 10-wicket win over England

Related Posts

ACB Probes Its Own Officers In Jharkhand Liquor Scam Case

October 12, 2025
Ranchi’s Three Major Bus Terminals To Be Upgraded To National Standards, ₹48.72 Crore Approved

Ranchi’s Three Major Bus Terminals To Be Upgraded To National Standards, ₹48.72 Crore Approved

October 11, 2025
Vinay Singh Appeals To ACB Court To Be Moved Out Of Isolation Cell

Vinay Singh Appeals To ACB Court To Be Moved Out Of Isolation Cell

October 11, 2025
Massive Crackdown On Power Theft In Jharkhand: 1,297 FIRs Lodged, ₹2.15 Crore Penalty Imposed

Massive Crackdown On Power Theft In Jharkhand: 1,297 FIRs Lodged, ₹2.15 Crore Penalty Imposed

October 10, 2025
PMGSY Progress in Jharkhand: 608 Roads Still Under Construction, 60 Yet to Be Awarded

PMGSY Progress in Jharkhand: 608 Roads Still Under Construction, 60 Yet to Be Awarded

October 10, 2025
Babulal Marandi Slams Govt Over Pending Post-Matric Scholarship Applications in Jharkhand

Babulal Marandi Slams Govt Over Pending Post-Matric Scholarship Applications in Jharkhand

October 10, 2025
Load More

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • About Editor
  • Advertise with us
  • Privacy Policy
  • Contact Us

© 2024 Lagatar News (Lagatar24.com)

No Result
View All Result
  • Home
  • Jharkhand
  • Bihar
  • National & World
  • Business
  • Health & Lifestyle
  • Sports
  • Entertainment
  • Career
  • Tech – Gyan
  • Opinion

© 2024 Lagatar News (Lagatar24.com)