Lagatar24.com
Language : HINDI
  • Home
  • Jharkhand
  • Bihar
  • National & World
  • Business
  • Health & Lifestyle
  • Sports
  • Entertainment
  • Career
  • Tech – Gyan
  • Opinion
Thursday, 30 April, 2026
Lagatar24.com
  • Home
  • Jharkhand
  • Bihar
  • National & World
  • Business
  • Health & Lifestyle
  • Sports
  • Entertainment
  • Career
  • Tech – Gyan
  • Opinion
Lagatar24.com
No Result
View All Result
  • Home
  • Jharkhand
  • Bihar
  • National & World
  • Business
  • Health & Lifestyle
  • Sports
  • Entertainment
  • Career
  • Tech – Gyan
  • Opinion
Home National & International

Morbi bridge tragedy: Gujarat HC questions MoU for bridge maintenance

Lagatar News by Lagatar News
November 15, 2022
in National & International
Share on FacebookShare on Twitter

Lagatar24 Desk

 

New Delhi, Nov 15: The Gujarat High Court questioned the Morbi civic council for failing to issue a tender for upkeep of the Morbi bridge while hearing a suo motu petition about the Morbi bride disaster. The High Court raised its eyebrows over the way in which the contract for renovation was granted to the Gujarat-based Ajanta Manufacturing, a part of the Oreva Group.

“The term of the contractor ended in 2016, despite that no tender was floated by the Morbi Municipal Corporation for the upkeep of the bridge,” the court said.

The bench also demanded a copy of the bridge repair contract between the private contractor and the Morbi municipal corporation. According to the court, the bench was informed that the civic body had not received a notification.

“Notice was issued by the registry. The municipal body is trying to act smart now,” said the court.

Through the advocate general, the Gujarati government informed the court that Diwali caused a significant increase in traffic on the bridge.

“Gujarat Police was on the spot within five minutes of the incident to rescue people from the river. All rescue operations were carried out at lightning speed. The chief minister and home minister, too, reached the site within a few hours,” the advocate general said.

The court gave instructions to Morbi’s principal district judge to make sure the municipal corporation received notice that the hearing would take place again tomorrow. In October, a hanging bridge built over the Machhu dam in Gujarat’s Morbi district collapsed, leaving over 130 people dead and hundreds injured and sparking a widespread panic.

Share76Tweet47
Previous Post

Badminton World Tour Finals 2022 shifted from China to Thailand due to Covid-19

Next Post

Make your mark in the competitive world, says SNMMCH principal to new MBBS batch

Related Posts

Jairam Ramesh Demands Voting Rights Be Made Fundamental, Targets Election Commission

Jairam Ramesh Demands Voting Rights Be Made Fundamental, Targets Election Commission

April 30, 2026
US Returns 657 Stolen Antiquities to India in Major Cultural Repatriation

US Returns 657 Stolen Antiquities to India in Major Cultural Repatriation

April 30, 2026
Delhi-NCR Under Severe Storm Alert as IMD Issues Red Warning

Delhi-NCR Under Severe Storm Alert as IMD Issues Red Warning

April 30, 2026
Mamata Dismisses Exit Polls, Confident of TMC Victory in Bengal

Mamata Dismisses Exit Polls, Confident of TMC Victory in Bengal

April 30, 2026
Bengaluru Rains Flood Streets, Iconic Bookstore Loses Thousands of Books

Bengaluru Rains Flood Streets, Iconic Bookstore Loses Thousands of Books

April 30, 2026
AIADMK Considers Tie-Up with Vijay’s TVK After Strong Exit Poll Show

AIADMK Considers Tie-Up with Vijay’s TVK After Strong Exit Poll Show

April 30, 2026
Load More

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • About Editor
  • Advertise with us
  • Privacy Policy
  • Contact Us

© 2024 Lagatar News (Lagatar24.com)

No Result
View All Result
  • Home
  • Jharkhand
  • Bihar
  • National & World
  • Business
  • Health & Lifestyle
  • Sports
  • Entertainment
  • Career
  • Tech – Gyan
  • Opinion

© 2024 Lagatar News (Lagatar24.com)