Lagatar24.com
Language : HINDI
  • Home
  • Jharkhand
  • Bihar
  • National & World
  • Business
  • Health & Lifestyle
  • Sports
  • Entertainment
  • Career
  • Tech – Gyan
  • Opinion
Thursday, 13 August, 2026
Lagatar24.com
  • Home
  • Jharkhand
  • Bihar
  • National & World
  • Business
  • Health & Lifestyle
  • Sports
  • Entertainment
  • Career
  • Tech – Gyan
  • Opinion
Lagatar24.com
No Result
View All Result
  • Home
  • Jharkhand
  • Bihar
  • National & World
  • Business
  • Health & Lifestyle
  • Sports
  • Entertainment
  • Career
  • Tech – Gyan
  • Opinion
Home Jharkhand

No Electricity, drinking water supply for last 72 hours in Hazaribag

Lagatar News by Lagatar News
May 28, 2023
in Jharkhand
Share on FacebookShare on Twitter

LAGATAR24 NETWORK

 

Hazaribag, May 28: In Hazaribagh and surrounding areas, there is a hue and cry for electricity and water. On May 25, at around 5 pm, an hour-long strong wind and rain made the residents of the city sleepless. Even after 72 hours, the power system has not become normal here.

Due to no electricity, the water supply in the city has collapsed. At the same time, due to lack of electricity, even the motor for government and private boring is not running. In such a situation, a severe water problem has arisen in the city.

The power supply system has not been normalized till now in the entire Hazaribagh district and surrounding areas including Korra, Demotand, Matwari, Heerbagh Chowk, Dipu Gadha Colony, Kumhar Toli, PTC area, Indrapuri, Daily Market, Mohan Talkies area, Chatra Road of the city.

Hazaribagh Superintendent Engineer Sudhir Kumar told that according to the local people, such a storm had never come in the history of Hazaribagh. A large number of electric poles and wires have collapsed in this storm. Hundreds of transformers have been damaged. A large number of 33 and 11 KV lines were also broken down due to the storm. However, now most of the KVA line has been fixed. The work of installing electric poles and wires has also been completed. Sudhir Kumar said that from this evening till Monday, the power supply system will become normal in the entire Hazaribagh.

Share76Tweet47
Previous Post

Ramesh Dhanuka sworn in as Chief Justice of Bombay High Court

Next Post

Left parties observe Black Day against not inviting President to new Parliament’s inauguration

Related Posts

Ambulance Stationed for Protesting Students Lacks Medicines, ORS and Paracetamol Given for All Ailments

Ambulance Stationed for Protesting Students Lacks Medicines, ORS and Paracetamol Given for All Ailments

August 13, 2026
Jharkhand HC Seeks Response from JBVNL MD Over Improperly Installed Cable Wires

Jharkhand HC Directs Speedy Completion of Waste Management Work at Jhiri Dumping Site

August 13, 2026
Jharkhand HC Seeks Response from JBVNL MD Over Improperly Installed Cable Wires

Jharkhand HC Seeks Response from JBVNL MD Over Improperly Installed Cable Wires

August 13, 2026
JPSC Scam: Khyangte Accused of Tampering with Evidence, Probe Reveals Attempt to Delete Office Data

JPSC Scam: Khyangte Accused of Tampering with Evidence, Probe Reveals Attempt to Delete Office Data

August 13, 2026
CAG Report: Jharkhand Govt Fails to Furnish Utilisation Certificates for Rs 1.60 Lakh Crore Expenditure

CAG Report: Jharkhand Govt Fails to Furnish Utilisation Certificates for Rs 1.60 Lakh Crore Expenditure

August 11, 2026
Jharkhand Plans Up to 20% Hike in Water Connection Fees, 30 Civic Bodies Submit Reports

Jharkhand Plans Up to 20% Hike in Water Connection Fees, 30 Civic Bodies Submit Reports

August 11, 2026
Load More

Leave a Reply Cancel reply

Your email address will not be published. Required fields are marked *

  • About Editor
  • Advertise with us
  • Privacy Policy
  • Contact Us

© 2024 Lagatar News (Lagatar24.com)

No Result
View All Result
  • Home
  • Jharkhand
  • Bihar
  • National & World
  • Business
  • Health & Lifestyle
  • Sports
  • Entertainment
  • Career
  • Tech – Gyan
  • Opinion

© 2024 Lagatar News (Lagatar24.com)